Norway House Cree Nation Health Center of Excellence Offsite Sewer & Water Project

The Challenge

In conjunction with the development of the Norway House Cree Nation Health Center of Excellence (NHCN HCE) project, sewer and water service was required to be expanded in the community. This project involved the design and construction of services from the existing community infrastructure to Fort Island. The Project was constrcuted by JNR Construction a Joint Venture between the Norway House Cree Nation and Sigfusson Northern Ltd.

Our Solution

JNR working closely with NHCN, JRCC and other regulatory parties were able to successfully develop a sewer and water expansion that would service both current and future needs. In addition to the NHCN members employed directly by JNR throughout this project as additional resources were required JNR looked to Playgreen Development Corporation to supply equipment.

JNR installed a combination of uninsulated and insulated HDPE butt fused pipe using a variety of methods including open trench cutting, sunken river crossings as well as controlled trench blasting. Due to the close proximity to residential housing controlled blasting was required to be completed for the pipe and lift station installation. In addition to the pipe and lift station installations a truck fill station and metering chambers were both installed. The truck fill station allows for more efficient and timely water deliveries throughout the community. The metering chambers while not required were installed as best practice to monitor sewage effluent flowing through them and in the event of a leak or failure allow the community operator to ensure system integrity.

Project Specs

Location: Norway House, Manitoba

Description: Offsite Sewer & Project Management

Completed on: Fall 2020

Gallery